On the Critical Path (1971)
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
User rating:
Cast
See More
Storyline
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
| Tagline: | |
| Certification: | Unknown |
Cast
Directed By
Writing Credits
Production Crew
|
|
Dennis Sawyer |
Producer |
Edited By
Costume and Makeup
Sound
|
|
Bernard Bordeleau |
Sound Editor |
Visual Effects
Camera
Lighting
Art Department
Other Crew
|
|
Kenneth McCready |
Script |
Reviews & Recommendations
Video Gallery
Coming Soon...
Photo Gallery
Coming Soon...